Remove 2018 Remove Ceiling Systems Remove Fire Protection System Installation Remove Historic Preservation
article thumbnail

4 Inspiring Adaptive Reuse Projects With Real Impact

The Pro Builder

Honoring the past while giving new life to a structure—and with it, often an entire neighborhood—requires creative thinking to successfully meld modern codes with preservation goals. BB+M Architecture focused on creating livable, modern spaces while retaining the mill’s historical character.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.