Remove 2018 Remove Energy Conservation Remove Land Use Regulations Remove Stakeholder Engagement
article thumbnail

2023 Yearbook of Engineering Achievement: Environmental/Sustainability

Civil + Structural Engineer

Retrofitting the Ballston Wetland Park was a high-priority project in Arlington County’s Stormwater Management Program, and they were able to seek community input through a stakeholder advisory committee as well as with several community meetings to provide input to the design process.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The building’s strategic design includes a 35 percent targeted reduction in potable water use through efficient fixtures and equipment, a 25 percent targeted reduction in energy costs with a focus on thermal performance and optimal heating, and a 360-panel floating solar array to name a few. ladder truck, fire engine and ambulance.