Remove 2019 Remove Building Design Remove Health Regulations Remove Land Use Regulations
article thumbnail

Under Water?

Civil + Structural Engineer

Wastewater systems are not designed for this changing climate,’’ said Sri Vedachalam, Director for water equity and climate resilience at Corvias Infrastructure Solutions, LLC. They were designed for an older climate that probably doesn’t exist anymore.” The family of Maryland woman, Trina Cunningham, knows the danger all too well.

article thumbnail

5 things developers should know about mass timber

BDC Network

5 things developers should know about mass timber 0 qpurcell Thu, 02/15/2024 - 13:36 Mass Timber Gensler's Erik Barth, architect and regional design resilience leader, shares considerations for developers when looking at mass timber solutions. Erik Barth Regulations Mass Timber Wood The Changing Built Environment The U.N.’s

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

Chicago’s Digital Manufacturing and Design Institute (DMDII), has partnered with McKinsey & Co. Within each institute, manufacturers of all sizes partner with academia and government to share manufacturing technology and workforce challenges—and build a robust, sustainable R&D infrastructure. Photo: tedescopictures.com).

article thumbnail

Beca on the gold mine under our feet

Roads Online

Each soil type performs differently, especially when there is a building or road placed on top of it. There are millions of kilometres of pipes, conduits, and optical fibre beneath our feet which provide us with power, the internet and more. Underground water, like contamination, needs to be critically understood prior to building.

article thumbnail

Advanced Manufacturing: Manufacturing Gets Smarter, Faster

Business Facilities

Taking advantage of that strong educational and training foundation is the new BRIDG (Building the Innovation Development Gap) facility at NeoCity in Osceola County. The 109,000-square-foot building has two clean rooms built on a 6-million-pound, 3.5-foot Photo: Enterprise Florida). That new legislation turned quick results.

article thumbnail

Read the Latest News on UK Delays Low-carbon Rules, UK Pays Bae $5b for Royal Navy SSN-AUKUS, Global Holdings Builds UK’s Largest Full Timber Edifice, and Hs2 Train Link Frustrates Business

UK Construction Blog

The post Read the Latest News on UK Delays Low-carbon Rules, UK Pays Bae $5b for Royal Navy SSN-AUKUS, Global Holdings Builds UK’s Largest Full Timber Edifice, and Hs2 Train Link Frustrates Business appeared first on UK Construction Blog. Building low-carbon homes from the start is cheaper and climate-friendly.