Remove 2019 Remove Energy Conservation Remove Stakeholder Engagement
article thumbnail

2023 Yearbook of Engineering Achievement: Environmental/Sustainability

Civil + Structural Engineer

Retrofitting the Ballston Wetland Park was a high-priority project in Arlington County’s Stormwater Management Program, and they were able to seek community input through a stakeholder advisory committee as well as with several community meetings to provide input to the design process.

article thumbnail

SAMI: Future proofing communities

Roads Online

Using renewable energies is part of SAMI Bitumen Technologies’ sustainability strategies to reduce the carbon footprint of the company’s Laverton facility in Victoria. Embracing sustainability aligns a business with its stakeholders’ long-term interests. Image: SAMI Bitumen Technologies.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2 Hudson Square: A New Landmark in New York City’s Architectural Landscape

Construction Daily News

LEED focuses on energy efficiency, water conservation, and reduced carbon emissions. This project incorporates energy-efficient systems to minimize its environmental impact. The curtain wall system enhances the building’s energy efficiency and helps control solar gain.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The building’s strategic design includes a 35 percent targeted reduction in potable water use through efficient fixtures and equipment, a 25 percent targeted reduction in energy costs with a focus on thermal performance and optimal heating, and a 360-panel floating solar array to name a few. ladder truck, fire engine and ambulance.

article thumbnail

40 Under 40: Champions of Construction 2022

Autodesk Construction Cloud

His efforts helped stakeholders maintain a single source of truth and paved the way for more meaningful and impactful collaboration between all levels of project staff. . With his effort to optimize data flow, Fei evolved the construction process that quickly tightened upstream and downstream operation stakeholders.”. Brian Popis .