Remove 2020 Remove Building Controls Remove Steel Fabrication
article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages.

article thumbnail

Concrete calculator

GCP Applied Technologies

Thu, 02/20/2020 - 19:50. February 20, 2020. The STRUX® calculator recommends correct dosage rates, for STRUX® 90/40 macro synthetic fibers , as a steel welded wire mesh (WWM) replacement in concrete installations. Commercial buildings. Residential buildings. Retail buildings. Concrete calculator. Architects.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages.

article thumbnail

Best Work Boots for Hot Weather/Summer (2020)

Work Gearz

Image Title Brand Price Buy Top KEEN Utility Men's Lansing Mid Steel Toe Waterproof Work Boot Construction, Raven/Tawny Olive, 11 D (Medium) US KEEN Utility Buy on Amazon Danner Men’s Tachyon 8” GTX Duty Boot,Black,10.5 KEEN Utility Men’s Lansing Mid Steel Toe Waterproof Work Boot . Foot care in summer’s. And Lots more! .

article thumbnail

Concrete mix design

GCP Applied Technologies

Fri, 03/06/2020 - 18:13. March 06, 2020. Control flow concrete. Controlled low-strength material (CLSM). Control flow concrete. Controlled low-strength material (CLSM). Control flow concrete. TB-1701 – Rheology-modifying high-range water reducer (HRWR) for the production of control flow concrete.

article thumbnail

Expanding the exterior footprint

Construction Specifier

Outdoor lifestyle is crucial to commercial buildings. At a time when crowds will be metered and access controlled like never before, public space is where people will spend a lot of time, waiting and doing all the things people do when they are idle.” Photos courtesy GKD-USA. by Dale Payne, P.E. for Fast Company.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

The post Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education appeared first on UK Construction Blog. The E-7 Wedgetail wingspan is 35.6 metres (117 feet).