Remove 2021 Remove Building Permits Remove Building Resilience
article thumbnail

National Labs Study Finds Updating Building Energy Codes Can Save Lives in Face of Intensifying Climate HazardsĀ 

Civil + Structural Engineer

Department of Energy (DOE) published a new report on July 13 called “Enhancing Resilience in Buildings Through Energy Efficiency.” The report underscores the impact of the 2021 IECC in protecting occupants from extreme temperatures due to power outages associated with hazard events.

article thumbnail

Policymakers urged to adopt updated energy code for climate resilience

Construction Specifier

Analysis finds that adopting the 2021 International Energy Conservation Code (IECC) can reduce deaths from extreme heat by as much as 80 percent. Department of Energy (DOE) published a new report on July 13, titled ā€œEnhancing Resilience in Buildings Through Energy Efficiency.ā€ Photo courtesy Bigstock.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

NAHB Advocacy Efforts and Outcomes

The Pro Builder

and providing greater flexibility when using bond financing to build or preserve LIHTC properties. Promoting Resilient Buildings Act In a positive development on the codes front, the House has passed the Promoting Resilient Buildings Act of 2023. Impact Fees In a separate Supreme Court case, Sheetz v.

article thumbnail

2023 Yearbook of Engineering Achievement: Environmental/Sustainability

Civil + Structural Engineer

Additionally, retrofitting the pond to provide higher quality water treatment helps the county comply with the municipal separate storm sewer system permit and contributes to restoring the Chesapeake Bay.

article thumbnail

Natural Grocers Reno, NV

The MCP Group

Bid Due Date | June 4, 2024 10:00 AM Project Description MCP Build Nevada License #0087202 The project consists of a 16,533 sf renovation to the existing building. 2021 Addenda None at this time.

article thumbnail

Natural Grocers Highlands Ranch, CO

The MCP Group

Bid Due Date | February 22, 2024 10:00 AM Project Description The project consists of a 23,740 sf renovation to the existing building. 2021 Addenda None at this time. The post Natural Grocers Highlands Ranch, CO appeared first on MCP GROUP.

article thumbnail

Caliber Collision Billings, MT

The MCP Group

Bid Due Date | March 19, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. 2021 Addenda None at this time. 2021 Addenda None at this time. We are to include erection.