Remove 2021 Remove Building Permits Remove HVAC Systems Remove Masonry
article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time. 2021 Addenda None at this time. The post Berkley Beer Garden appeared first on MCP GROUP.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Construction is the methodology of developing a building or infrastructure. What is Building Construction? Building development is the methodology of addition of structure to property. The overwhelming majority of building construction projects are bijou renovations, like incrporation of a room, or repair of a bathroom.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building. 2021 Addenda Lee-Lofts-Addendum-1-3-6-23 Pre-Bid/Job Walk Information A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST.

article thumbnail

Key Elements in a Fluid-applied Barrier System Specification

Construction Specifier

By Karine Galla Air and water-resistive barrier systems play a crucial role in the longevity and performance of commercial buildings, and safeguarding against issues such as excessive energy consumption and moisture-related damage. They promote drying because they allow vapor from inside the building to diffuse to the outside.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

If your roof has not had a proper drainage system, then you must face the issue of standing water problem. Date of Last Roofing Permit. Date of Last Roofing Permit. Lodgment category cost for building consent is 4A with an additional inspection of ½ hour. Building Consent No. Standing Water. Dutch Gable Roof.