Residence at Green Meadow – San Angelo, TX

The MCP Group

This is a new ground up 3 story wood framed senior living apartment building. Surveying, earthwork, site utilities, landscaping, lot striping, termite treatment, concrete, stone veneer, masonry, misc. 2021 Addenda None at this time. We are soliciting subcontractors for the following bid packages.

article thumbnail

Natural Grocers Waco, TX

The MCP Group

Bid Due Date | August 1, 2024 10:00 AM Project Description The project consists of a 14,736 sf renovation to the existing building. 2021 Addenda None at this time. The post Natural Grocers Waco, TX appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Natural Grocers Warr Acres, OK

The MCP Group

Bid Due Date | December 12, 2023 10:00 AM Project Description The project consists of a 14,736 sf renovation to the existing building. 2021 Addenda None at this time. The post Natural Grocers Warr Acres, OK appeared first on MCP GROUP.

Masonry 40
article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building. 2021 Addenda Lee-Lofts-Addendum-1-3-6-23 Pre-Bid/Job Walk Information A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST.

article thumbnail

Caliber Collision Billings, MT

The MCP Group

Bid Due Date | March 19, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. 2021 Addenda None at this time. 2021 Addenda None at this time. We are to include erection.

article thumbnail

Rossville Family Dental

The MCP Group

Bid Due Date | November 2, 2023 2:00 PM Project Description The project consists of a 5,608 sf renovation to the existing building with associated sitework. The building will be open from 10:00 AM to 2:00 PM on October 25 for site visitations. 2021 Addenda None at this time.

article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.