Remove 2021 Remove Building Resilience Remove Ceiling Systems
article thumbnail

Energy-saving strategies: Ceiling panels with phase change material (PCM)

Construction Specifier

The recent innovation of integrating phase change material (PCM), a well-established technology, into ceiling panels has generated significant interest. Thermal mass As climate change continues to drive extreme weather events, there is an increasing emphasis on enhancing the resiliency of the built environment.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

California’s eco-hub receives AIA awards for energy-efficient, sustainable design

Construction Specifier

A high-performance building envelope minimizes thermal bridging, enhancing interior thermal comfort with substantial R values at the roof and walls. The building’s energy use intensity (EUI) is reduced to 23, a 71 percent decrease from the baseline, thanks to efficient building systems and envelope design. U-value, 0.27

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.

article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time. The post Berkley Beer Garden appeared first on MCP GROUP.