Remove 2021 Remove Building Resilience Remove Fire Protection Systems
article thumbnail

Rebuilding from the Wreckage with Nudura ICFs

The Pro Builder

Rebuilding from the Wreckage with Nudura ICFs kcichowicz Fri, 09/29/2023 - 10:57 Case Study Image In December 2021 in Superior, Colorado, the Morris family was forced to flee their home as the Marshall Fires ravaged their community. ICFs create a durable building enclosure that can withstand many different forces of nature.

article thumbnail

National Science Foundation Awards Research Funding to Advance Performance-Based Fire Design for Cold-Formed Steel Structures

Civil + Structural Engineer

WASHINGTON, DC – A research project progressing from the American Iron and Steel Institute’s (AISI) Small Project/Fellowship Program has received significant funding through the National Science Foundation (NSF) to advance performance-based fire design for cold-formed steel (CFS) structures. Thomas Gernay, Ph.D.,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LSU Civil Engineering Professor Aims to Create Offshore Energy Infrastructures That Resist Hurricanes, Aging

Civil + Structural Engineer

Fortunately for the oil and gas industry, LSU Civil and Environmental Engineering Associate Professor Chao Sun is researching how to create resilient offshore energy infrastructure under extreme tropical cyclones and aging issues. The BioLab plant experienced a chemical fire and toxic chlorine gas release. were greatly affected.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.