article thumbnail

Residence at Green Meadow – San Angelo, TX

The MCP Group

2021 Addenda None at this time. Surveying, earthwork, site utilities, landscaping, lot striping, termite treatment, concrete, stone veneer, masonry, misc. The post Residence at Green Meadow – San Angelo, TX appeared first on MCP GROUP.

article thumbnail

Salina Fire Station #4

The MCP Group

2021 Addenda None at this time. Location Salina, Kansas Plans 00001-Salina Fire Station 4_Bid Set Specifications 00002-Salina Fire Station 4_Project Manual General Information Bid Invitation Salina Fire Station #4 MCP Supplemental Conditions.2021 The post Salina Fire Station #4 appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Nominate Your Favorite Construction Podcast for Best of 2021!

Construction Junkie Blog

Contest Rules Nominations can be submitted from now until Midnight PST on Friday, June 4, 2021. If you have questions, feel free to post a comment below or email us at info@constructionjunkie.com Submit Your Nomination for the Best Construction Podcast of 2021! At that time, no more nominations will be accepted. First Name. Electrical.

article thumbnail

Washburn University Mabee Library Renovation

The MCP Group

2021 Addenda None at this time. Bid Due Date | August 6, 2024 2:00 PM Project Description The MCP Group is the Construction Manager on this project. The project consists of a limited 48,759 sf interior renovation. The post Washburn University Mabee Library Renovation appeared first on MCP GROUP.

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework.

article thumbnail

CDGB Bookstore – Independence, KS

The MCP Group

Bid Packages are available for the following; Demolition with ACM abatement, Masonry Restoration, Carpentry with window replacement, EPDM roofing system with (flashings, insulation, parapet caps, gutters and downspouts), Concrete, and Steel fabrications with installation. 2021 Plans 100% Bookstore Final Set-4.16.24

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. The post KHRC Office Remodel appeared first on MCP GROUP.