Remove 2021 Remove Carpentry Remove Fire Protection Systems
article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

2021 Addenda None at this time. Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP. Location New Century, Kansas Plans A-014626 Drawings Specifications KDOT Gardner Subarea Complex Combined Specifications General Information KDOT Gardner Subarea Complex Bid Invite MCP Supplemental Conditions.2021

article thumbnail

Liberal High School Library Renovation

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. The post Liberal High School Library Renovation appeared first on MCP GROUP.