Remove 2021 Remove Carpentry Remove Flooring Systems Remove Steel Fabrication
article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

2021 Addenda None at this time. Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

2021 Addenda None at this time. Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

2021 Addenda None at this time. Worth ECHO (Moriah at Timberland Addition) — 4.14.23 MCP Supplemental Conditions.2021 The post Echo Suites – Fort Worth, TX appeared first on MCP GROUP.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

2021 Addenda None at this time. Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft. MCP Supplemental Conditions.2021

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

2021 Addenda Lee-Lofts-Addendum-1-3-6-23 Pre-Bid/Job Walk Information A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST. This is strongly encouraged, but not mandatory.