Remove 2021 Remove Carpentry Remove Masonry
article thumbnail

Wolgast Corporation Marks 75th Anniversary

Wolgast Corporation

Wolgast Masonry in 1948, his motto of “Do it right the first time, every time” has been his legacy that still steers the company today. In 2021, the Board of Directors appointed Steve Salyers as President, while Stadler maintained the role of CEO. Wolgast Corporation Marks 75th Anniversary! Started by Gerald Wolgast as G.H.

article thumbnail

CDGB Bookstore – Independence, KS

The MCP Group

Bid Packages are available for the following; Demolition with ACM abatement, Masonry Restoration, Carpentry with window replacement, EPDM roofing system with (flashings, insulation, parapet caps, gutters and downspouts), Concrete, and Steel fabrications with installation. 2021 Plans 100% Bookstore Final Set-4.16.24

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

2021 Addenda None at this time. Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23

article thumbnail

Jones Advisory Group New Headquarters

The MCP Group

2021 Addenda None at this time. Location Topeka, Kansas Plans 2_Drawing Set_Jones Advisory Group – 2023-12-27 Specifications 1a_Project Manual_Jones Advisory Group New Headquarters 1b_JAG_MEP_Spec_ General Information Bid Invitation Jones Advisory Group New Headquarters MCP Supplemental Conditions.2021

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. 2021 Addenda Lee-Lofts-Addendum-1-3-6-23 Pre-Bid/Job Walk Information A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST. Will be restored into a 50-unit apartment building.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

2021 Addenda None at this time. Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021