Remove 2021 Remove Carpentry Remove Masonry Remove Plumbing
article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework.

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SCCC West Campus Conversion

The MCP Group

2021 Addenda None at this time. Bid Due Date | May 1, 2024 1:30 PM Project Description The project consists of a 14,250 sf remodel to the existing building with associated sitework. The post SCCC West Campus Conversion appeared first on MCP GROUP.

article thumbnail

Liberal High School Library Renovation

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. The post Liberal High School Library Renovation appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 MCP Supplemental Conditions.2021 MCP Supplemental Conditions.2021

article thumbnail

Jones Advisory Group New Headquarters

The MCP Group

2021 Addenda None at this time. Location Topeka, Kansas Plans 2_Drawing Set_Jones Advisory Group – 2023-12-27 Specifications 1a_Project Manual_Jones Advisory Group New Headquarters 1b_JAG_MEP_Spec_ General Information Bid Invitation Jones Advisory Group New Headquarters MCP Supplemental Conditions.2021

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.