Remove 2021 Remove Fire Protection Systems Remove Masonry
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical. Uncontrolled air movement through penetrations in the building enclosure can increase energy costs as HVAC systems work harder to condition the air.

article thumbnail

AIM FIRE STOP BLOCKS NOW TESTED FOR WIDER APPLICATION

Specification Product Update

AIM – Acoustic & Insulation Manufacturing Fire Stop Blocks are now backed by test evidence covering a wider range of applications. Tested to the principles of BS EN 1366-4:2021, AIMs Fire Stop Blocks also have IFC Certification Ltd third-party certification. Our Fire Stop Block range is comprehensive.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. The post KHRC Office Remodel appeared first on MCP GROUP.

article thumbnail

Liberal High School Library Renovation

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. The post Liberal High School Library Renovation appeared first on MCP GROUP.