Remove 2021 Remove Land Use Regulations Remove Permits Remove Quality Control
article thumbnail

2023 Yearbook of Engineering Achievement: Environmental/Sustainability

Civil + Structural Engineer

Additionally, retrofitting the pond to provide higher quality water treatment helps the county comply with the municipal separate storm sewer system permit and contributes to restoring the Chesapeake Bay.

article thumbnail

Environmental Regulations in Construction: What Contractors Need to Know

Levelset

Environmental laws provide the backbone for permitting and reporting requirements on construction projects, while a wide variety of state and municipal laws impose even stricter rules. In construction, environmental regulations generally focus on stormwater, waste disposal, hazardous waste handling, and air quality.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Learn About the Latest News on How New Construction is a Dangerous Formula, Smith Currie and Oles Morrison to combine, US Mountain Valley Natgas Pipe Building

Construction Daily News

billion Mountain Valley natural gas pipeline , West Virginia environmental officials have issued a new water permit, clearing the way for construction to resume. Dams, levees, and stormwater infrastructure received a D grade from the American Society of Civil Engineers in 2021. Assistance is coming. What can communities do?

article thumbnail

Uncover the Latest News on New UK Building Product Launched by Markel, Arup Cuts Jobs as UK Construction Slows, British Construction Firm Buckingham Group Near Collapse, South East Plans Permission-ready Properties First, and Construction Business Civil Sanction Boosts Charity Funds

UK Construction Blog

Due to unprecedented inflation that the government has failed to control for over a year, HS2 is apparently on hold for at least two years, and other major roadbuilding projects have been shelved. of 1,787 dwellings permitted. Other regions have trouble finding development-ready lands. Arup began working on HS2 in 2015.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The building’s strategic design includes a 35 percent targeted reduction in potable water use through efficient fixtures and equipment, a 25 percent targeted reduction in energy costs with a focus on thermal performance and optimal heating, and a 360-panel floating solar array to name a few. .: