Remove 2021 Remove Masonry Remove Painting/finishing
article thumbnail

Additional practical insights on overcladding masonry facades

Construction Specifier

Considerations for the use of exterior insulation and finish system (EIFS) overclad solutions. Insulation and air barriers One premise of the original article is that the bearing walls of many government and school buildings across North America, built in the last century with solid masonry, are now experiencing moisture intrusion.

Masonry 52
article thumbnail

Salina Fire Station #4

The MCP Group

2021 Addenda None at this time. Location Salina, Kansas Plans 00001-Salina Fire Station 4_Bid Set Specifications 00002-Salina Fire Station 4_Project Manual General Information Bid Invitation Salina Fire Station #4 MCP Supplemental Conditions.2021 The post Salina Fire Station #4 appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Trembly White Readiness Center Improvements

The MCP Group

2021 Addenda ADD 1 The post Trembly White Readiness Center Improvements appeared first on MCP GROUP. Bid Due Date | September 10, 2024 2:00 PM Project Description The project consists of an elevator and vestibule additions and renovation to the existing building.

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021 The post KHRC Office Remodel appeared first on MCP GROUP.

article thumbnail

SCCC West Campus Conversion

The MCP Group

2021 Addenda None at this time. Location Liberal, Kansas Plans 23-059 SCCC – West Campus Conversion Full CD Set Specifications 23-059 SCCC West Campus Conversion – Final Specifications General Information Bid Invitation SCCC West Campus Conversion MCP Supplemental Conditions.2021

article thumbnail

Jones Advisory Group New Headquarters

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. Location Topeka, Kansas Plans 2_Drawing Set_Jones Advisory Group – 2023-12-27 Specifications 1a_Project Manual_Jones Advisory Group New Headquarters 1b_JAG_MEP_Spec_ General Information Bid Invitation Jones Advisory Group New Headquarters MCP Supplemental Conditions.2021