Remove 2021 Remove Masonry Remove Painting/finishing
article thumbnail

Additional practical insights on overcladding masonry facades

Construction Specifier

Considerations for the use of exterior insulation and finish system (EIFS) overclad solutions. Insulation and air barriers One premise of the original article is that the bearing walls of many government and school buildings across North America, built in the last century with solid masonry, are now experiencing moisture intrusion.

Masonry 52
article thumbnail

Jones Advisory Group New Headquarters

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. Location Topeka, Kansas Plans 2_Drawing Set_Jones Advisory Group – 2023-12-27 Specifications 1a_Project Manual_Jones Advisory Group New Headquarters 1b_JAG_MEP_Spec_ General Information Bid Invitation Jones Advisory Group New Headquarters MCP Supplemental Conditions.2021

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021

article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

In the southeast, concrete masonry systems and cast-in-place concrete systems (with removable forms) both offer price-competitive wall and floor systems. A panelized building system allowed the builder to dry in faster, leave the structure over the first winter, then return in the summer to finish interiors.

article thumbnail

KU Geological Core Library Addition

The MCP Group

2021 Addenda ADD 1 The post KU Geological Core Library Addition appeared first on MCP GROUP. Location Lawrence, Kansas Plans KU Gelogical Core Library Addition Combined Plans Specifications A-014987 Specifications General Information Bid Invitation KU Geological Core Library Addition MCP Supplemental Conditions.2021

article thumbnail

SCCC West Campus Conversion

The MCP Group

2021 Addenda None at this time. Location Liberal, Kansas Plans 23-059 SCCC – West Campus Conversion Full CD Set Specifications 23-059 SCCC West Campus Conversion – Final Specifications General Information Bid Invitation SCCC West Campus Conversion MCP Supplemental Conditions.2021