Remove 2021 Remove Masonry Remove Plumbing
article thumbnail

Jayhawk Theatre Foundation Repair

The MCP Group

The work includes site demolition, earthwork, asphalt paving, site concrete, site utilities, selective demolition, cast-in-place concrete, masonry restoration, waterproofing, doors/frames/hardware, painting, plumbing, and electrical. 2021 Addenda None at this time.

Masonry 40
article thumbnail

Jones Advisory Group New Headquarters

The MCP Group

2021 Addenda None at this time. Bid Due Date | January 24, 2024 2:00 PM Project Description The project consists of a new 14,500 sf steel framed building.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Natural Grocers Brownsville, TX

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. Location Brownsville, Texas Plans SR – Brownsville, TX – Issued For Permit Specifications SR – Brownsville, TX – Specifications General Information Bid Invitation Natural Grocers Brownsville, TX MCP Supplemental Conditions.2021

Masonry 40
article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

article thumbnail

Natural Grocers Warr Acres, OK

The MCP Group

2021 Addenda None at this time. The post Natural Grocers Warr Acres, OK appeared first on MCP GROUP.

Masonry 40
article thumbnail

Natural Grocers Waco, TX

The MCP Group

2021 Addenda None at this time. 2021 Addenda None at this time. The post Natural Grocers Waco, TX appeared first on MCP GROUP.

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework.