Remove 2021 Remove Masonry Remove Waterproofing Systems
article thumbnail

Additional practical insights on overcladding masonry facades

Construction Specifier

This is a follow-up article speaking to additional questions in this system type. Considerations for the use of exterior insulation and finish system (EIFS) overclad solutions. The appropriateness of face-sealed systems in certain climate regions. This approach results in a waterproof, breathable, and attractive facade.

Masonry 52
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical. Uncontrolled air movement through penetrations in the building enclosure can increase energy costs as HVAC systems work harder to condition the air.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

TCF Industrial Building #1

The MCP Group

2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework.

article thumbnail

KHRC Office Remodel

The MCP Group

2021 Addenda None at this time. Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

2021 Addenda None at this time. Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

2021 Addenda None at this time. Worth ECHO (Moriah at Timberland Addition) — 4.14.23 MCP Supplemental Conditions.2021 The post Echo Suites – Fort Worth, TX appeared first on MCP GROUP.