Remove 2023 Remove Building Resilience Remove Fire Protection Systems Remove Plumbing
article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.

article thumbnail

Seward County CC CDL Truck Driving School

The MCP Group

Bid Due Date | July 6, 2023 2:00 PM Project Description The project consists of a new 20,710 sf partial structural steel frame, partial PEMB frame. 2021 Addenda None at this time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Great Bend Readiness Center Addition

The MCP Group

Bid Due Date | September 26, 2023 2:00 PM Project Description The project consists of a 12,327 sf addition with a 7,650 sf renovation and sitework. 2021 Addenda ADD 1 ADD 2 plus attachments The post Great Bend Readiness Center Addition appeared first on MCP GROUP.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BDC Network

rcassidy Mon, 06/05/2023 - 12:44 Andrew Lehrer and Tyler Jensen, Environmental Systems Design A significant climate impact can be achieved with hybrid electrification that balances capital expenditure and operating expenses. is a complex system that delivers power as it is produced.