Berkley Beer Garden
The MCP Group
SEPTEMBER 19, 2023
Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.
The MCP Group
SEPTEMBER 19, 2023
Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.
The MCP Group
JUNE 21, 2023
Bid Due Date | July 6, 2023 2:00 PM Project Description The project consists of a new 20,710 sf partial structural steel frame, partial PEMB frame. 2021 Addenda None at this time.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
The MCP Group
AUGUST 14, 2023
Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021 2021 Addenda None at this time.
The MCP Group
SEPTEMBER 8, 2023
Bid Due Date | September 26, 2023 2:00 PM Project Description The project consists of a 12,327 sf addition with a 7,650 sf renovation and sitework. 2021 Addenda ADD 1 ADD 2 plus attachments The post Great Bend Readiness Center Addition appeared first on MCP GROUP.
The MCP Group
JUNE 26, 2023
Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.
The MCP Group
JUNE 26, 2023
Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft.
BDC Network
JUNE 5, 2023
Implementing an ‘asset drawdown strategy’ for site decarbonization Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects.
Let's personalize your content