Remove 2023 Remove Building Resilience Remove Fire Protection Systems Remove Site Planning
article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.

article thumbnail

Seward County CC CDL Truck Driving School

The MCP Group

Bid Due Date | July 6, 2023 2:00 PM Project Description The project consists of a new 20,710 sf partial structural steel frame, partial PEMB frame. 2021 Addenda None at this time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Great Bend Readiness Center Addition

The MCP Group

Bid Due Date | September 26, 2023 2:00 PM Project Description The project consists of a 12,327 sf addition with a 7,650 sf renovation and sitework. 2021 Addenda ADD 1 ADD 2 plus attachments The post Great Bend Readiness Center Addition appeared first on MCP GROUP.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft.

article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BDC Network

Implementing an ‘asset drawdown strategy’ for site decarbonization Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects.