Jones Advisory Group New Headquarters
The MCP Group
JANUARY 10, 2024
Bid Due Date | January 24, 2024 2:00 PM Project Description The project consists of a new 14,500 sf steel framed building. 2021 Addenda None at this time.
The MCP Group
JANUARY 10, 2024
Bid Due Date | January 24, 2024 2:00 PM Project Description The project consists of a new 14,500 sf steel framed building. 2021 Addenda None at this time.
The MCP Group
NOVEMBER 14, 2023
Bid Due Date | December 5, 2023 10:00 AM Project Description The project consists of renovations to (3) Natural Grocers stores in the Temple/Austin area. The project consists of a 21,062 sf phased, limited renovation to the existing building in Temple. The project consists of a lighting replacement to the existing building in Austin.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
The MCP Group
AUGUST 14, 2023
Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)
The MCP Group
MARCH 14, 2024
Bid Due Date | March 27, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. Location North Little Rock, AR Plans AR Maumelle 3346-Building Plans (Rev3)-2024.03.06 We are to include erection.
The MCP Group
NOVEMBER 15, 2023
Bid Due Date | December 12, 2023 10:00 AM Project Description The project consists of a 14,736 sf renovation to the existing building. 2021 Addenda None at this time.
The MCP Group
JUNE 26, 2023
Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)
The MCP Group
JUNE 26, 2023
Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)
Let's personalize your content