Remove 2023 Remove Landscaping Remove Plumbing Systems Remove Steel Fabrication
article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft.

article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System. Construction Management Co.:

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The season of celebration and joyous reunion will soon be upon us, and Civil+Structural Engineer Magazine is proud to kickstart the season of celebration by announcing our 2023 Yearbook of Engineering Achievement. Terminal C’s design successfully navigated an aggressive four-year construction schedule without disrupting airport operations.

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. 2021 Addenda Lee-Lofts-Addendum-1-3-6-23 Pre-Bid/Job Walk Information A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST. Will be restored into a 50-unit apartment building.