Remove 2024 Remove Building Resilience Remove Fire Protection System Installation Remove Stakeholder Engagement
article thumbnail

Maryland Schools Exhibit Rockfon Acoustic Ceiling Systems

CCR Magazine

PGCPS is the first jurisdiction in the nation to use a Public Private Partnership design, build, finance and maintenance model to bundle the construction and maintenance of a group of public schools. The facilities transform the educational experience and provide engaging spaces that are more flexible and adaptable to modern pedagogy.

article thumbnail

Advancing sustainable construction: Specifying low-carbon concrete

Construction Specifier

2 Buildings are responsible for approximately 42 percent of CO2 emissions, 15 percent of which is attributed to the embodied carbon of materials. trillion sf) of building floorspace by 2060—equivalent space of New York City added every month for 40 years—the time for the industry to act is now. Millions of properties across the U.S.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The start of December marks the beginning of the end for 2024 as we begin to wind down on what has been another momentous year in the AEC industry. The four-lane divided highway also features a protected bike lane, shielded from traffic with a concrete wall barrier.

article thumbnail

Connecticut Has A New – And – Nearly $1 Billion Dollar- revitalization Mixed Use Construction Project On The Connecticut River. The Well Known Development Group Sets The Tentative Schedule For The Planning, Design, & Development As The Largest new Mixed Use Project In Nearly 50 Years Takes Shape

Bylt News

The scope of Port Eastside is ambitious, even daunting as stated by stakeholders. In addition, the town of East Hartford would had to approve a $45 million & tax incremental financing; agreement to build a 1,000-space parking garage that would be hidden behind a structure to buffer it from the river.