Remove 2024 Remove Carpentry Remove Landscaping
article thumbnail

Residence at Green Meadow – San Angelo, TX

The MCP Group

Bid Due Date | December 10, 2024 2:00 PM Project Description Project is not subject to Davis-Bacon wage requirements, and is tax exempt. Surveying, earthwork, site utilities, landscaping, lot striping, termite treatment, concrete, stone veneer, masonry, misc. This is a new ground up 3 story wood framed senior living apartment building.

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Salina Fire Station #4

The MCP Group

Bid Due Date | October 17, 2024 2:00 PM Project Description The project consists of a new 19,600 sf fire station.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021

article thumbnail

10 Budget-Friendly Renovation Ideas for Your Villa in 2024

UK Construction Blog

The post 10 Budget-Friendly Renovation Ideas for Your Villa in 2024 appeared first on UK Construction Blog. In 2024, transforming your villa doesn’t require a hefty budget. Trade-offs and Challenges: While DIY storage solutions can be budget-friendly, they might require carpentry skills or additional tools.

article thumbnail

KDEM Emergency Operations & Training Center

The MCP Group

Bid Due Date | September 4, 2024 2:00 PM Project Description The project consists of an addition and renovation to the existing building.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework.