Remove 2024 Remove Ceiling Systems Remove Electrical Systems Remove HVAC Systems
article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. This esteemed honor results from the county’s recent restoration of its 1898 Courthouse, a project steeped in history.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time. 2021 Addenda None at this time. The post KHRC Office Remodel appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Liberal High School Library Renovation

The MCP Group

Bid Due Date | May 14, 2024 10:00 AM Project Description The project consists of a 5,686 sf remodel to the existing library. 2021 Addenda None at this time.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework.

article thumbnail

KSU Animal Science Arena

The MCP Group

Bid Due Date | March 7, 2024 2:00 PM Project Description The project consists of a new 79,507 sf PEMB arena with heavy timber framing, structural steel and associated sitework. 2021 Addenda ADD 1 The post KSU Animal Science Arena appeared first on MCP GROUP.