Remove 2024 Remove Electrical Systems Remove Fire Protection Systems
article thumbnail

Armstrong Aids Expansion of Deep Lake Water Cooling System

CCR Magazine

Armstrong Fluid Technology recently participated in the expansion of the Enwave Energy Corporation Deep Lake Water Cooling (DLWC) system that provides clean energy services to buildings in downtown Toronto via an innovative district cooling network. Armstrong supplied six 600hp Design Envelope pumps to the project,” Scarafile added.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Liberal High School Library Renovation

The MCP Group

Bid Due Date | May 14, 2024 10:00 AM Project Description The project consists of a 5,686 sf remodel to the existing library. 2021 Addenda None at this time.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.