Remove 2024 Remove Electrical Systems Remove HVAC Systems Remove Plumbing Systems
article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. This esteemed honor results from the county’s recent restoration of its 1898 Courthouse, a project steeped in history.

article thumbnail

Armstrong Aids Expansion of Deep Lake Water Cooling System

CCR Magazine

Armstrong Fluid Technology recently participated in the expansion of the Enwave Energy Corporation Deep Lake Water Cooling (DLWC) system that provides clean energy services to buildings in downtown Toronto via an innovative district cooling network. Armstrong supplied six 600hp Design Envelope pumps to the project,” Scarafile added.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

article thumbnail

Construction Material Outlook Q1 2024

The MCP Group

Construction Material Outlook – Q1 2024 Lumber: Trending up In 2023, lumber prices experienced an overall decline following the spikes observed in 2020. HVAC/Electrical/Plumbing: Trending up Significant backlogs persist for equipment, particularly in mechanical, electrical, and plumbing categories.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

Liberal High School Library Renovation

The MCP Group

Bid Due Date | May 14, 2024 10:00 AM Project Description The project consists of a 5,686 sf remodel to the existing library. 2021 Addenda None at this time.