Remove 2024 Remove Fire Protection Systems Remove Plumbing Systems
article thumbnail

World’s 1st 100% Digitally-Enabled Facility

CCR Magazine

Created as a model of post-2030 smart and sustainable construction, this 100% digitally-enabled facility integrates a diverse range of building systems technology (HVAC, lighting, building envelope, security, IT, and communications)”, said Paul Scarafile, Commercial Director, Canada, Armstrong Fluid Technology. “As

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The start of December marks the beginning of the end for 2024 as we begin to wind down on what has been another momentous year in the AEC industry. The four-lane divided highway also features a protected bike lane, shielded from traffic with a concrete wall barrier.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. The Minnie Howard Campus high school offers enhanced daylight, thermal comfort, acoustics and indoor air quality.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.