Remove 2024 Remove Landscaping Remove Masonry Remove Plumbing
article thumbnail

Runway 35 N. Lot 3 CAVA

The MCP Group

Bid Due Date | May 30, 2024 2:00 PM Project Description The project consists of a new 2,623 sf shell building. Location Denver, Colorado Plans Cava Runway Bid Set_8969 E 46th Ave_05-06-2024 Runway 35 N Amendment No.8 8 Construction Plans Specifications On the plans. 2021 Addenda None at this time.

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

Caliber Collision El Paso, TX

The MCP Group

Bid Due Date | March 6, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. We are to include erection. 2021 Addenda None at this time.

article thumbnail

Sherwin Williams Maize, KS

The MCP Group

Bid Due Date | March 12, 2024 2:00 PM Project Description The project consists of a new 4,500 sf wood framed paint store with sitework. Please note the owner furnished items listed in the plans. 2021 Addenda None at this time.

article thumbnail

Caliber Collision Billings, MT

The MCP Group

Bid Due Date | March 19, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. We are to include erection. 2021 Addenda None at this time.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.