Remove 2024 Remove Masonry Remove Site Planning
article thumbnail

Legends Hyundai Premier Auto Outlet

The MCP Group

Bid Due Date | January 16, 2025 2:00 PM Project Description The project consists of a new 14,900 sf partial structural steel, partial metal building, and site work. Location Kansas City, Kansas Plans 2024-12-19 Legends Hyundai Premier Auto Outlet – Bid Set – Stamped-Combined Specifications On the plans.

article thumbnail

A journey through masonry reclad litigation

BDC Network

After completion of the initial site review work, Walter P Moore identified 15 stone units that appeared to be laterally displaced, thereby presenting potential falling-debris life-safety hazards. Following phase 2, phase 3 investigations were conducted, covering additional areas of the façade not previously reviewed.

Masonry 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Jayhawk Theatre Foundation Repair

The MCP Group

Bid Due Date | April 24, 2024 2:00 PM Project Description The project consists of repairing and waterproofing the existing building foundation and associated sitework. 2021 Addenda None at this time. The post Jayhawk Theatre Foundation Repair appeared first on MCP GROUP.

Masonry 40
article thumbnail

Runway 35 N. Lot 3 CAVA

The MCP Group

Bid Due Date | May 30, 2024 2:00 PM Project Description The project consists of a new 2,623 sf shell building. Location Denver, Colorado Plans Cava Runway Bid Set_8969 E 46th Ave_05-06-2024 Runway 35 N Amendment No.8 8 Construction Plans Specifications On the plans. 2021 Addenda None at this time.

article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KU Geological Core Library Addition

The MCP Group

Bid Due Date | November 7, 2024 2:00 PM Project Description The project consists of a new 5,532 sf addition, with a limited renovation and associated sitework. 2021 Addenda ADD 1 The post KU Geological Core Library Addition appeared first on MCP GROUP.