Remove 2025 Remove Ceiling Systems Remove Flooring Systems
article thumbnail

Equans wins £72m West London estate recladding job

Construction Enquirer

Now a major safety remediation project aims to bring the homes back into use between 2025 and 2026. The work also includes a complete internal refurbishment to all areas, including new lighting, ceilings, furniture, flooring, and landscaping. The Paragon Estate was developed by Berkeley First, part of Berkeley Group.

article thumbnail

Historic landmark’s renovation nears completion

Construction Specifier

Louis will reopen on May 3, 2025, ushering in a new era of accessibility, educational programming, and community engagement. Structural and system improvementsRenovated ceilings and flooring, a state-of-the-art fire suppression system, upgraded HVAC systems, and general restoration and improvements.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

A heating recovery system uses the exhausted air to pre-heat and pre-cool incoming air before it’s delivered to the home. The factory panelizes the ceilings, floors, and walls, then brings all the elements together to form the module. The Montana factory is expected to open in the first half of 2025.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

“I knew the view from the back of the lot would be great but also a little off-center to the right,” Coletti says, “so I put the kitchen in the left back corner of the floor plan to capture the best view.” The rest of the 7,800-square-foot, single-level floor plan flowed fairly easily from there, he says.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. Rockfon ceiling panels also comply with all acoustic ceiling requirements for LEED v4.

article thumbnail

Schimenti Announces Printemps Opening at One Wall Street

CCR Magazine

” Spanning 55,000 square feet over two floors, the U.S. The final installation was completed in February 2025, leading to the store’s public opening in March, which coincided with the first day of springa significant milestone, as “Printemps” means “spring” in English.

article thumbnail

PREMIER Design + Build breaks ground on NY Logistics Center

CCR Magazine

The 146,075-square-foot logistics center will feature 36-foot ceiling heights, 54-foot by 60-foot column spacing, 31 docks, two drive-in doors, and a 3,000-square-foot office space. The facility will include a 3,000 amp, three-phase, 277-480 volt electric service and an ESFR sprinkler system.