Remove 2025 Remove Ceiling Systems Remove Ramps
article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

A heating recovery system uses the exhausted air to pre-heat and pre-cool incoming air before it’s delivered to the home. The factory panelizes the ceilings, floors, and walls, then brings all the elements together to form the module. The Montana factory is expected to open in the first half of 2025.

article thumbnail

2 Hudson Square: A New Landmark in New York City’s Architectural Landscape

Construction Daily News

This project incorporates energy-efficient systems to minimize its environmental impact. The curtain wall system enhances the building’s energy efficiency and helps control solar gain. Revised plans indicate that the construction is anticipated to ramp up significantly.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.