Remove 2025 Remove Ceiling Systems Remove Stonework
article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

The rear elevation optimizes the home’s view of the Las Vegas Valley and the Strip with floor-to-ceiling telescoping glass doors that pocket into adjacent walls for seamless indoor-outdoor flow. Continuing the flooring and ceiling materials from indoors to outside further strengthens the indoor/outdoor connection.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.