Remove 2025 Remove Energy Efficiency Remove Ramps
article thumbnail

West Gate, Metro tunnels ramping up ahead of 2025 opening

Roads Online

Concerning other projects across the state, an eight-day December blitz will take place to remove 10 level crossings, with works also ramping up on the removal of four level crossings in Melton, along with the new Melton Station.

Ramps 59
article thumbnail

Design contract awarded for $200M Sydney road upgrade

Roads Online

The design works, awarded to WSP, will aim to improve the efficiency of the corridor by delivering shorter travel times, while increasing safety for both motorists and pedestrians. Stage 1B will provide two lanes in each direction between Auld Avenue and the M5 Motorway.

Contracts 105
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Public feedback driving SRL East

Roads Online

Suburban Rail Loop is a 90-kilometre orbital rail line that will help transform the way Melbourne grows, improving travel efficiency for more than 80 per cent of Melburnians and take more than 600,000 cars off the roads every day.

Ramps 103
article thumbnail

Adapting to Regulatory Changes: Navigating New Building Codes in 2025

Construction Daily News

To help in this regard, keep reading as we explore some of the most effective strategies for adapting to new building codes in 2025. What to Expect from Building Codes in 2025 As can be expected, standards of excellence are only set to increase in the construction industry in 2025.

article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

Prefab, Modular Homebuilder Touts Energy and Cost Benefits qpurcell Wed, 10/04/2023 - 09:00 Dvele —a California-based manufacturer of prefab, modular homes—got started by bringing two building concepts together: high performance and factory construction. The Montana factory is expected to open in the first half of 2025.

article thumbnail

LEGO breaks ground on $1B carbon-neutral factory in Virginia

Construction Specifier

When completed in 2025, the LEGO factory aims to be carbon-neutral, meaning it can demonstrate net-zero emissions from electricity and fuel use (scope one and two), using on-site or off-site renewable energy. The children’s ideas will inspire the final landscaping design in 2025. Rendering showing the lobby of LEGO’s factory.

article thumbnail

Rachel Reeves’ Speech: The Impact on the UK AEC Industry

Rapport3

Rachel Reeves' Speech: What It Means for the UK AEC Industry and How Rapport3 Can Help On January 29, 2025, Chancellor Rachel Reeves delivered a pivotal speech outlining the governments ambitious plans to boost economic growth, accelerate infrastructure projects, and reform planning regulations.