Remove 2026 Remove Foundation Systems Remove Prefabrication Remove Site Planning
article thumbnail

Designing Resilient Stormwater Systems 

Civil + Structural Engineer

Many current stormwater systems are based on outdated design criteria that are incapable of handling future expected greater rainfall intensities and the resulting extreme flood events. The core philosophy of LID is conscious site planning.

article thumbnail

Remember those 56,000 U.S. bridges that were classified as structurally unsound? They are about to be rebuilt 

Civil + Structural Engineer

The bipartisan infrastructure bill provided $5 billion per year until 2026 just for bridges. Accelerated Bridge Construction is changing how state transportation departments plan, design, and construct bridges without interrupting traffic. Construction is forecasted for 2026.The Construction is forecasted for 2026.The