Remove 2027 Remove Energy Efficiency Remove Site Planning
article thumbnail

Green light for Canary Wharf science tower

Construction Enquirer

Canary Wharf Group and Kadans Science Partner have secured planning approval from Tower Hamlets Council for a new commercial health and life sciences building. The 23-storey tower will provide 823,000 sq ft of of life sciences laboratories and workspace at the North Quay site next to Crossrail Station and new Elizabeth Line at Canary Wharf.

article thumbnail

Amplify Cell Technologies Begins Construction of Mississippi Battery Cell Factory

For Construction Pros

The 500-acre site will be home to a 2 million square-foot, energy efficient facility. Amplify plans to begin battery cell production in 2027 and is expected to create more than 2,000 U.S. manufacturing jobs.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Sustainability and the Port of Virginia

Civil + Structural Engineer

These efforts are reflected in many infrastructure projects designed to modernize port facilities, increase operational efficiency, and significantly reduce environmental impact. Clean Energy Utilization : The port invests in wind and solar power to supply its energy needs. million twenty-foot equivalent units (TEUs).

article thumbnail

Shining a Light on Energy Saving Solar Projects

Plant & Civil Engineer

NI Water has further boosted its investment in renewable energy by installing solar panels that could save around c.218 The utility company aims to double its existing 8MW of solar generation by the end of the Price Control Period 2021- 2027. 218 tonnes of carbon in the first year. The solar panels have a combined capacity of 0.9

article thumbnail

SHARC Energy Announces 2022 Year End Financial Results

Civil + Structural Engineer

CSE: SHRC) (FSE: IWIA) (OTCQB: INTWF) (“SHARC Energy” or the “Company”) announces it has filed financial results for the year ended December 31, 2022. SHARC Energy foresees Gross margins will improve in 2023 to YE 2021 levels. SHARC International Systems Inc.

article thumbnail

AI Boom Fuels Global Data Center Demand

CCR Magazine

ZB in 2027, for a five-year compound annual growth rate of 18.5% [1]. Not only will this increased storage generate a need for more data centers, but generative AI’s greater energy requirements – ranging from 300 to 500+ megawatts – will also require more energy efficient designs and locations.

article thumbnail

Understand About the Latest News on Cambridge South Station Begins Construction, Major Contractors Support Diesel-free Locations, UK Construction Grows, and Net Zero Design is Changing the Construction Business

UK Construction Blog

Meanwhile, the idea for diesel-free sites has the support of major contractors. Cambridge Biomedical Campus’s planned station, part of the projected East-West rail link, is accessible and will better connect the renowned medical research and health science institution to the UK’s train network. million passengers.