article thumbnail

Sustainability and the Port of Virginia

Civil + Structural Engineer

Skanska’s work improving 1,500 feet of an existing 3,540-foot wharf includes constructing three heavy lift berths, the wind turbine generator delivery berth, the installation/load-out berth, and the monopile delivery berth. billion in expansion projects slated to be completed by 2027.

article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Experts predict that global sales of printed houses will grow to USD 40 billion by 2027. Robotics: colleagues with muscles of steel If a robot lifts a heavy object, a repair may be necessary, but then it goes straight on – without sick leave and necessary reintegration. In contrast, experts estimate growth of 3.2%