Remove 2028 Remove Building Commissioning Remove Piping Installation
article thumbnail

City of Pearland Breaks Ground on Barry Rose Water Reclamation Facility Replacement and Expansion, and Longwood Water Reclamation Facility Decommissioning

Civil + Structural Engineer

The expansion project is scheduled to be completed in early 2028. McCarthy Building Companies, Inc. The Barry Rose WRF expansion includes addition of a new influent lift station, headworks, a six-basin Sequencing Batch Reactor structure, a non-potable water system, and other site utility, piping and security improvements.

Lifts 130
article thumbnail

Find About the Latest News on a Construction Company  Fined £550,000 After a Worker Died, Build-zone Insures Construction for 20 Years, UK Type 26 Frigate Glasgow Building Resumes, UK Construction Industry Recovery, and Darwen Tesco Opens

UK Construction Blog

Meanwhile, warranty service provider for structures Build-Zone is celebrating its 20th year in the building industry as an insurer. Furthermore, there are indications that things are turning around in the building business in the UK. Internal damage from the piping killed him. Why Build-Zone and structural warranty?

Zoning 52