Remove 2028 Remove Building Permits Remove Renewable Energy Systems
article thumbnail

Uncover the Latest News on US 45 Ramp to I-41 to Close, Construction Permit Application, US-131 Construction is Set to End on Friday, and Ferrovial Won $1.2b Infrastructure Contracts

Construction Daily News

Meanwhile, for the first time in more than 40 years, the US Nuclear Regulatory Commission (NRC) has docketed this kind of application for a commercial non-light water reactor and accepted TerraPower’s building permit application for evaluation. Natrium uses a 345 MWe sodium-cooled fast reactor with molten salt energy storage.

Ramps 52
article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

We also configured our Renewable Energy Leaders category to rank the metros that are using the most renewable energy, with some surprising results (hint: the top-ranked metro is the home of the oil bidness). (To The facility is slated to build four airplanes a month, but could expand to eight planes a month eventually.