Remove Approvals Remove Closeout Remove Material Storage
article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

Siloed Data and Information Many construction companies that attempt to use free or low-cost storage options that aren’t designed specifically for document control may end up spreading their files over multiple services – creating siloed information.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

Impregnation refers to a technique for treating absorbent materials with chemicals. Impregnating wood materials with fire retardants changes the chemical, physical, and mechanical properties of the wood, resulting in a complex new material. Flame spreads along the surface of the material as the test progresses.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

Review drawings and designs one final time At the start of the meeting, all drawings and designs should exist in a state of approval. The stark realities of complex coordination, inspection timelines, and closeout seem mercifully far away. However, if there’s a problem, you want to catch it up front.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. The JO will be, in part, the. may not, be identified in the UPB. Overhead.

article thumbnail

Buyer’s Guide to Evaluating and Selecting Construction Project Management Software

In Eight

Shared systems data can include cost, revenue, accounting, materials procurement, human resources, risk management and much more. Responsibilities of the data center infrastructure host: Storage hardware Network hardware and bandwidth Electrical capacity Application, data and server configuration System availability (i.e.,

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o Initiate o Execute o Closeout o Training. o Determine costs/pricing structure (labor, materials, overhead, etc.). Demonstrate knowledge of Thermal Energy Storage systems – (ex. chilled water storage, ice storage, potential energy storage etc). approve project payments/draws. Eng ineering.