Remove Approvals Remove Quality Assurance Remove Warranty
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

The quality assurance and closeout/warranty submittals are evidence the specified pressure-impregnated FRTW meets the quality assurance requirements and warranty provisions in the following sections. Quality assurance. It is subject to third-party inspection and quality assurance.

article thumbnail

High-performance coating systems

Construction Specifier

Once they determined the proper corrosion mitigation method, the team continued the mockup process by applying an AAMA 2605-approved primer system at a minimum dry film thickness (DFT) reading of 0.03 This was followed by an AAMA 2605-approved fluoropolymer topcoat at a minimum DFT reading of 0.05 The topcoat was applied in two layers.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Unlock Public Sector Construction Productivity – A White Paper

Job Order Contracting

Robust tools and processes have existing for decades that can assure quality repair, renovation, maintenance, and new builds are consistent delivered on-time and on-budget. Faster, Higher Quality, and Lower Cost Project Delivery. Complete Workflow Management and Reporting, including Forms, Approvals, and Timing. •

article thumbnail

Legal Construction Considerations in Design-Build Contracts

UK Construction Blog

Performance Guarantees and Warranties Performance guarantees and warranties supplied by the design-build team should be outlined in design-build contracts. This comprises craftsmanship quality, materials utilised, and adherence to design criteria.

article thumbnail

Job Order Contracting Program Manager

Job Order Contracting

Based upon the type and location of the organization, the JOC Program Manager must assure that the JOC Program is in full compliance statues/regulations/laws pertaining to the acquisition and use of capital funds for a facility and/or physical infrastructure renovation, repair, maintenance, and/or minor new construction.

article thumbnail

Job Order Contract Procurement Strategy

Job Order Contracting

The facility management authority and procurement/contracting/purchasing (purchasing) meet and discuss items such as timing (JOC start and end dates), available funding, access to local contractors, as well as any and all additional resources needed to achieve quality on-time and on-budget performance. Capabilities Being Acquired. Strategy.

article thumbnail

Enabling Job Order Contracting Through Training and LEAN Methods

Job Order Contracting

While Job Order Contracting has been used for decades and can drive significantly improved construction delivery productivity and higher quality, it must be deployed by skilled Owners and Contractors to achieved maximum benefit. Assure your JOC uses your current/required construction specifications, not those from an alternative source.