Remove Building Automation Remove Heavy Lifting Transportation Remove Renewable Energy Systems
article thumbnail

Sustainability and the Port of Virginia

Civil + Structural Engineer

This milestone aims to eliminate the port’s carbon footprint through various green initiatives, including the transition to renewable energy sources, the electrification of port operations, and infrastructure modernization. Clean Energy Utilization : The port invests in wind and solar power to supply its energy needs.

article thumbnail

$7.5B Digital Infrastructure City To Be Built In Las Vegas

Business Facilities

The net-zero buildings within their own insular mini-city will feature automated multi-functional designs, renewable energies from solar/wind/water/kinetic, autonomous vehicles, artificial intelligence (AI), augmented reality, Internet of Things (IoT), robotics, supertrees, and self-healing concrete structures.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Build lean, clean, and green: Exploring off-site heavy timber construction

Construction Specifier

Recent disruptions in supply chains, workforce shortages, and other obstacles to project schedules have led more owners and contractors to look for off-site, prefabricated construction methods to improve the quality and efficiency of their builds. Other advantages include the aesthetic quality and durability.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

We also configured our Renewable Energy Leaders category to rank the metros that are using the most renewable energy, with some surprising results (hint: the top-ranked metro is the home of the oil bidness). (To The facility is slated to build four airplanes a month, but could expand to eight planes a month eventually.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Review the Standard Operating Procedure for “Controlling Hazardous Energy Sources”. This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Review manufacturer’s instructions. Check Points: 1.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.