Remove Building Codes Remove Plumbing Systems Remove Wall Systems
article thumbnail

Black Buffalo Hits Print on First Internationally Code Compliant 3D-Printed Home

The Pro Builder

Black Buffalo Hits Print on First Internationally Code Compliant 3D-Printed Home qpurcell Wed, 05/29/2024 - 08:16 Black Buffalo 3D has broken ground in Fort Worth’s Southside community with its pilot LoMa 3D-printed home at 100 W. Black Buffalo 3D-printed home building process.

article thumbnail

ADVANTAGES OF PEX PLUMBING  SYSTEMS DETAILED IN NEW TECHNICAL DOCUMENT

Civil + Structural Engineer

PEX: State-of-the-Art for Potable Water; Historical Overview of Discontinued PB Piping Materials Also Examined IRVING, Texas – A new technical document that addresses the critical differences between crosslinked polyethylene (PEX) tubing systems with polybutylene (PB) systems has been published by the Plastics Pipe Institute, Inc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Steps to Cracking the Code for a High-Performance Home

The Pro Builder

The show home features cutting-edge technologies, the latest in building science principles and best practices, and offers a real-world glimpse into the future of residential building to a higher standard. Though it was no easy task, this year’s build followed a proven process that can be applied to any home at any price point.

article thumbnail

A Case (Study) for Off-Site Construction in Home Building

The Pro Builder

Rather, it employed an off-site construction method that built all of the wall panels, floor panels, and roof trusses in a nearby factory and assembled them on site in fewer than three days. he was struck by an eerie silence. Although there was plenty of activity, the buzz of saws was noticeably absent.

article thumbnail

A Homebuilding Factory that Comes to You

The Pro Builder

You’re deploying 90% of the build using traditional skilled labor.” Photo courtesy Cuby Technologies Cuby’s mobile micro factory is an inflatable dome of about 30,000 to 40,000 square feet that contains the entire home-construction production system. We focus not on the home, the end product, but on the system,” Gampel says. “We

article thumbnail

Homes That Are Both Prefab and Predesigned

The Pro Builder

Their collaboration enables homeowners or builders to select from Hereabout’s list of preexisting, ready-to-use design plans, then build the home using B.PUBLIC’s prefab floor, roof, and wall panels. B.PUBLIC says its homes use 80% to 90% less energy to heat and cool than code-built homes. We don’t displace builders.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The post Top 10 Construction Defects: Prevent These Costly Building Mistakes appeared first on UK Construction Blog. The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years.