Remove Building Commissioning Remove Building Performance Measurement Remove Ramps
article thumbnail

Are We Missing an Important Element of Sustainability Reporting?

Autodesk Construction Cloud

In the US, the Securities and Exchange Commission has been deliberating on a proposed set of disclosure rules since the spring of 2022 and is expected to finalize them this fall. The following changes to how Compass builds led to some significant environmental achievements. Compass Datacenters is among them. Roofing materials.

article thumbnail

Sports Training Facilities: Creating Successful Environments Focused on High Performance and Athlete Wellbeing 

Civil + Structural Engineer

By: Alex Brown, Senior Project Manager, Mortenson and Tamara Hartner, Design Phase Executive, Mortenson Well-designed and expertly constructed sports training facilities have the power to influence more than just performance. For student-athletes, this includes academic support spaces outfitted with tutors, study rooms, and more.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. Measured Drawing Information. design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. Measured Drawing Information. design/negotiate/build).

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventive maintenance services should be performed by a qualified manufacturer’s service representative. Notify affected personnel before performing PM (alarmed or security entrances). Observe performance of various components, such as brake, limit switches, door operating speed, motor, gear box, etc. Standard tools – basic 2.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

The post Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education appeared first on UK Construction Blog. Totally revolting.” Latham isn’t alone.