Remove Building Commissioning Remove Energy Conservation Remove HVAC Systems Remove Renewable Energy Systems
article thumbnail

Why Pay Attention to HVAC Faults? System Performance Depends on It

The Pro Builder

Why Pay Attention to HVAC Faults? But while the efficiency of heating, ventilation, and air conditioning (HVAC) equipment has improved across the board, improper installation or commissioning can result in HVAC system faults that compromise HVAC performance and reduce energy efficiency.

article thumbnail

Considerations for Green Building Design

PN - Project Management

Commercial buildings account for a large percentage of the overall carbon emissions in the world. Due to this alarming statistic, building or retrofitting structures in line with green initiatives and transitioning to a sustainable building method are logical solutions to reduce C02 emissions.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Code Compliance & Beyond: Upping Baseline Building Energy Performance

Stok

Due to their embodied carbon and operational carbon footprints, buildings play a significant role in these efforts, so understanding the impact of legislation on buildings is critical. This directly translates to building energy codes. And, the result of this baseline? And, the result of this baseline?

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

The core competencies identified include competencies relating to building operations and maintenance, energy management, sustainability, water efficiency, safety (including electrical safety) and building performance measures. Fede ral Buildings Personnel Training Act.