Remove Building Commissioning Remove Heavy Lifting Transportation Remove Insurance Management
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. 00 41 53 Bid Form – Design/Build (Single-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. 00 41 53 Bid Form – Design/Build (Single-Prime Contract).

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Sliding Doors a) Center door within track and remove, start by lifting up to remove from bottom track first. Adjust and service as needed.