Remove Building Commissioning Remove Heavy Lifting Transportation Remove Land Use Regulations
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). design/negotiate/build).

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to davits, structures typically used to lower things over an edge. All fall protection equipment is required by OSHA to be checked prior to each use. Do not use defective ladders. Sliding Doors a) Center door within track and remove, start by lifting up to remove from bottom track first.