Remove Building Commissioning Remove Historic Preservation Remove HVAC System Installation
article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

The award was fittingly presented to the Adair County Commission in the historic 1917 Missouri State Capital along the banks of the Missouri River in Jefferson City, Missouri. The architectural integrity of Adair’s courthouse is a testament to the craftsmanship of a bygone era, making its preservation paramount.

article thumbnail

Folger Shakespeare Library Reopens After Major 4-Year Renovation

CCR Magazine

The home of the world’s largest collection of Shakespeare materials aims to connect with 21st-century audiences with a radically more accessible and welcoming building. Three commissioned artworks by contemporary artists offer visitors creative entry points through which to consider Shakespeare and the early modern world.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Connecticut Has A New – And – Nearly $1 Billion Dollar- revitalization Mixed Use Construction Project On The Connecticut River. The Well Known Development Group Sets The Tentative Schedule For The Planning, Design, & Development As The Largest new Mixed Use Project In Nearly 50 Years Takes Shape

Bylt News

In addition, the town of East Hartford would had to approve a $45 million & tax incremental financing; agreement to build a 1,000-space parking garage that would be hidden behind a structure to buffer it from the river. Port Eastside LLC paid $4 million for a low-rise office building on 7.3

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

The core competencies identified include competencies relating to building operations and maintenance, energy management, sustainability, water efficiency, safety (including electrical safety) and building performance measures. Fede ral Buildings Personnel Training Act. The core competencies will be updated annually per the law.